Survey Engineer

  • RESUME

    Liaquat Ali



    Liaquat Ali
    Gender Male
    Religion Islam
    Nationality PakistanI

    Liaquat Ali(survey Manager)
    Key Skills expert for all surveying works with latest survey instruments Like G P S and Total Stations.
    Current Industry Construction / Civil Engineering
    Current Functional Area Engineering
    Current Job survey manager in Al Nahar Company Libya on Great Man Made River Project (A biggest project in the world)
    Current Location Tripoli - Libya
    Years of Experience 9Year(s) 0 Month(s)
    Work Level Managerial Level
    Previous Job surveyor - Sui northern Gas pipeline LTD
    Languages Known Arabic, English, Urdu
    Education
    Basic Education Diploma of Associate Engineer (Civil) Pakistan, in 1998 in 1st Division
    Summary of Skills and Experience
    I am expert of survey with latest digital survey instruments like Total station, Lasers and GPS and have 9 Years total Experience

    IT Skills
    Skill Name Last Used Proficiency Level Experience
    Auto cad Land Development 2007 Proficient 4 Year(s) 0 Month(s)

    ms word , ms axle, 2007 Proficient 4 Year(s) 0 Month(s)




    PERSONAL:
    NAME: LIAQUAT ALI
    FATHER NAME: AHMAD KHAN
    DATE. O.B: JAN-05-1979
    NATIONALITY: PAKISTANI
    RELIGION: ISLAM
    BLOOD GROUP: B+v
    MATRIAL STATUS: MARRIED

    PERMANENT ADDRESS
    VILLAGE BASTI THABLE P/O CHECK NO 2 TEHSEEL PINDI BHATTIAN.DISST.HAFIZABAD PUNJAB PAKITAN
    POSTAL ADDRESS: DISST. SHAKUPURA SANGLA HILL MOHLAH AHMAD ABAD
    STREET NO 4 ALLAMA IQBAL BAZAR C/O YASEEN SHOPE KEEPER
    PUNJAB PAKISTAN.
    CONTACT NOS: 00218 92 8196474 (in Libya) 00923009416584 (PERSONAL)
    00923006688722 (CALL FOR NAVEED UL HASSAN)
    EMAIL ADDRESS: [email removed]
    [email removed]

    QUALIFICATION: 1: DIPLOMA OF ASSOCIATE ENGINEER (CIVIL)
    FROM GOVT. COLLEGE OF TECHNOLOGY RASUL MANDI BHAUDINE
    (PUNJAB BOARD OF TECHNICAL EDUCATION LAHORE PAKISTAN)
    IN 1998 IST DIVISION GETTING 67% MARKS
    2:PASSED S.S.C EXAMINATION FROM BOARD OF INTERMEDIATE AND
    SECONDERY EDUCATIN GUJRANWALA BOARD PUNJAB PAKISTAN
    IN 1994 IN IST DIVISION GETTING 65% MARKS

    LANGUAGES: ENGLISH , URDU, ARABIC, PUNJABI, PUSHTO, SINDHI

    COMPUTER SKILLS: M.S EXEL,M.S WORD,WINDOW 2000 , AUTO CAD 2007 AND
    AUTO CAD LAND DEVELOPMENT 2000



    PROFESSIONAL RICH EXPERIENCE: 9 YEARS

    1:NOV.2006TO TILL NOW
    CLIENT: GREAT MAN MADE RIVER AUTHORITY (GMRA)LIBYA
    CONSULTANT: BROWN &ROOT NORTH AFRICA
    EMPLOYER : AL NAHAR COMPANY LIMITED LIBYA(A DEPARTMENT ASHTABLISHED BY THE GOVERNMENT OF LIBYA)
    JOB TITLE : : SURVEY MANAGER
    SCOP OF JOb : 1) :NATURE OF PROJECT
    PROJECT NAME: GREAT MAN-MADE RIVER PROJECT TAT (TRIPOLI TO BIR TIRFAS)

    PROJECT IS CONSIST TO MAKE A PCCP PIPE LINE 3800 TO 1600 mm DIA (i.d)
    FOR IRRIGATION &WATER SUPPLY PURPOSE IN LIBYA.

    2: RESPONSIBILTIES
    a: TO ASTABLISH MAIN CONTROL POINTS WITH GPS 1200 SYSTEM OF
    LIECA USING RTK SURVEY TECHNIQUE.
    b: STAKE OUT R.O.W (RIGHT OF WAY) WITH GPS
    c: TO STAKE OUT CENTRE LINE FOR PIPE LINE BY TOTAL STATION,
    d: CALCULATING ALL STAKE OUT DATA FOR R.O.W ,PIPE CENTRE LINE
    AND FOR HAUL ROAD
    e: TO CALCULATE LEVEL ACCORDING TO DESIGN PROFILE
    OF HAUL ROAD
    f: MAKING TRAVERS FOR PRIMERY CONTROL POINTS
    g: LAYING OF CONTROL POINTS ALONG TRENCH (BY TRAVERSING)
    h: RECEIVING OF TRENCH FROM SUB CONTRACTOR ACCORDING TO
    SPECIFICATION &DESIGN.
    I: TO HANDLE ALL MATTERS RELATED WITH SURVEY
    j: SUPERVISE ALL SURVEY ACTIVITIES & FIXE DUTIES OF SURVEY TEAM
    k: MAKING ALL SHOPE DRAWINGS, CROSS SECTIONS AND CUT / FILL QUANTITIES OF HAUL ROAD BY AUTO CADE.

    2:NOV.2004 TO NOV 2006
    CLIENT: GREAT MAN MADE RIVER AUTHORITY (GMRA)LIBYA
    CONSULTANT: BROWN &ROOT NORTH AFRICA
    EMPLOYER : AL NAHAR COMPANY LIMITED LIBYA(A DEPARTMENT ASHTABLISHED BY THE GOVERNMENT OF LIBYA
    JOB TITLE : : SURVEY ENGINEER
    SCOP OF JO : 1) :NATURE OF PROJECT
    PROJECT NAME: GREAT MAN-MADE RIVER PROJECT PHASE III –AL
    GARDABYA/ ASSDADA LINK.
    PROJECT IS CONSIST TO MAKE A PCCP PIPE LINE 4000 mm DIA (i.d) FOR
    IRRIGATION &WATER SUPPLY PURPOSE IN LIBYA.
    2: RESPONSIBILTIES
    a: TO STAKE OUT CENTRE LINE FOR PIPE LINE BY TOTAL STATION,
    b: LAYING OF CONTROL POINTS ALONG TRENCH (BY TRAVERSING)
    c: RECEIVING OF TRENCH FROM SUB CONTRACTOR ACCORDING TO
    SPECIFICATION &DESIGN.
    d: TO HANDLE ALL MATTERS RELATED WITH SURVEY
    e: SUPERVISE ALL SURVEY ACTIVITIES & FIXE DUTIES OF SURVEY TEAM

    3:FEB 2004 TO OCT2004 :
    CLIENT / OWNER: SUI NORTHERN GASE PIPE LINE LIMITED (PAKISTAN)
    CONSULTANT: SUI NORTHERN GASE PIPE LINE LIMITED (PAKISTAN)
    EMPLOYER : SUI NORTHERN GASE PIPE LINE LIMITED (PAKISTAN)
    JOB TITLE : TOTAL STATION OPERATER(SURVEYOR)

    SCOPE OF JOB: 1: NATURE OF PROJECT
    PROJECT WAS COSIST TO DESIGN SURVEY FOR 12 inc DIA TRANSMISSION
    GASE PIPE LINE IN SIX DISTRICT OF N.W.F.P AREA HANGU,KARAK,BANU,
    LAKIMARVAT ,DERA ISMAEL KHAN &TANK IN PAKISTAN ALMOST400 KM
    2:RESPONSIBILITIES:
    a: SELCTION OF ROUTE FOR PIPE LINE (ROUT SURVEY) BY GLOBEL POSSI-
    TIONING SYSTEM (G.P.S)
    b: MAKING STATIONING AND READING PROFILE ON SELECTED ROUTE.
    C: MAKING PLAN OF CRROSINGS AND DRAW PROFILE
    d: ALL OTHER SURVEY ACTIVITIES FOR REQUIRED FOR DESIGN OF ROUT
    e: COLECTING ALL TOPOGRAPHY DETAIL ALONG THE SELECTED ROUT
    4:MAY 2003 TO NOV 2003:

    CLIENT / OWNER: NATIONAL HIGHWAY AUTHORTY(N.H.A) PAKITAN
    CONSULTANT: NATIONAL ENGINEERING SERVICE PAKISTAN (NESPAK)
    EMPLOYER: ABASEEN GROUP PVT LTD (PAKISTAN)
    JOB TITLE: SURVEY ENGINEER CUM SITE ENGINEER
    SCOPE OF JOB : 1: NATURE OF PROJECT (N 70)
    a :PROJECT WAS CONSIST 62 KM ASPHALT ROAD FROM BEWATA TO
    KHAJURY INCLUDING 6 NO.MAIN PRESTRESED GIRDER BRIDGES AND
    ALMOST 175 CULVERTS IN BALOCHISTAN (PAKISTAN)
    2: RESPONSIBILITES
    A: STAKE OUT THE CENTR LINE FOR DIFFERENT ACTIVITIES
    b: CALCULATIONS OF LEVELS ACCORDING TO DESIGN AND PREPAIRIN-
    G OF REACHES(FILLINGS,SUB GRADE, WATER BOUND MACDAM)
    c: CALCULATION OF QUANTITIES &MAKING RUNNING BILLS
    d: SUPERVISION &MANAGEMENT OF SITE
    e: CONTROL ALL SURVEY ACCTIVITIES ACCORDING TO DESIGN AND
    SPECIFICATIONS
    f : MAKING CROSS SECTION ON AUTO CADE
    g: DEALING WITH SUB – CONTRACTORS AND CONSULTANTS

    5:AUG 2000 TO MAY 2003
    CLIENT / OWNER SHEIKH ZAID BIN SULTAN AL NYAN (LATE PRESIDENT OF U.A.E &RULER
    OF ABU DUBI)
    CONSULTANT: ASHFAQ ASSOCIATE PVT LTD.(PAKISTAN)
    EMPLOYER: TECHNICAL ASSOCIATE PAKISTAN PVT LTD.
    JOB TITLE: SITE SUPERVISER CUM SURVEYOR
    SCOPE OF JOB : 1: PROJECTS BACK GROUND
    a: CONSTRUCTION OF RESIDENCIAL COMPLEX IN SHEIKH ZAID PALACE
    RAHIME YAR KHAN PUNJAB (PAKISTAN)
    PROJECT WAS CONSIST TO CONSTRUCT 4 VILAS AND SO MUCH OTHER
    BUILDINGS
    b: CONSTRUCTION OF HIGH SCHOOL IN IMAN GHAR RAHIM YAR KHAN
    c: CONTRUCTION OF WORK SHOPE BUILDING (TRUSES +ST.STRUCTURE)

    2: RESPONSIBILITIES
    a: SUPERVISE THE SITE ,MANAGE ALL ACCTIVITIES OF SITE , ARRANGE
    MANPOWER REQUIRED FOR SITE
    b: SUPERVISE ALL FINISHING ACTIVITIES (MARBLE, TILES,PLASTER ,
    ,PAINT AND POLISHING OF MARBLE ETC.
    C : CONTROL THE SITE AND ARRANGE ALL REQUIRED MATIRIAL.
    D: DEALING WITH SUB CONTRACTOR AND CONSULTANTS.

    6: SEP 1999 TO MARCH 2000
    CLIENT / OWNER LASMO OIL PAKISTAN (ENGLAND BASED COMPANY)
    CONSULTANT: HULLCROW PVT. LTD.
    EMPLOYER: MEC ENGINEERING COMPANY.
    JOB TITLE: SURVEYOR
    SCOPE OF JOB: 1: PROJECT BACK GROUND
    a: PROJECT WAS CONSISTED 134 KM ACCESS ROAD (20 KM IN HILLY
    AREA AND 114 IN PLAN AREA) AND LOCATION ACCTIVITIES FOR
    WELL DRILLING.
    2: RESPONSIBILTITIES
    a: SELCTION OF ROUTE WITH G.P.S ACCORDING TO DESIGN LIMITS
    b: SUPERVISING OF DRILLING FOR BLASTING & DOSING
    c: CONTROL ELEVATION ACCORDING TO DESIGN.

    7: SEP 1998 TO SEP 1999
    CLIENT / OWNER NATIONAL HIGHWAY AUTHORITY (N.H.A N5)
    CONSULTANT A.A.ASSOCIATE PVT LTD.
    EMPLOYER: SACHAL ENGINEERING WORKS PVT.LTD. (PAKISTAN)
    JOB TITLE SURVEYOR
    SCOPE OF JOB 1: PROJECT BACK GROUND
    PROJECT NAME: CHABLAT TO NOSHERA ADDITIONAL CARRAIGE WAY
    N5 IN PUNJAB+ N.W.F.P (PAKISTAN)
    a: PROJECT WAS CONSISTED 63 KM ASPHALT ROAD &2 BRIDGES IN
    WHICH ONE ON INDUS RIVER AND SO MUCH CULVERTS
    2: REPOSIBILITIES
    a: PREPARATION OF REACHES IN EARTH FILL AREAS+ SUB GRADE ETC.
    b: STAKE OUT HORIZONTAL ALLIGNMENT




    INSTRUMENTS USED

    1: G.P.S (GLOBEL POSSIONING SYSTEM)
    A: LIECA GPS SYSTEM 1200 WITH REAL TIME
    DEVICE (RTK) ACCURACY 1cm
    B: MAGELIAN, NAV .DNLX-10
    C: SPORTRAKE (POCKET SIZE)


    2: TOTAL STATIONS
    A: LEICA TC 1800, TC 1103
    B: SOKKIA SET 2C, SET 4C, SET 5F, SET 6F
    C: TOPCON GTS 100, GTS 101, GTS 102

    3: LASERS:
    A: LASER LLP -670, LASER PLAN (JAVELIN-S LEICA)

    4: DIGITLE THEODOLITES
    A): TOPCON DT 104, DT100 B) SOKKIA DT5, DT6

    ADDITIONAL KNOWLODGE:
    I ALSO DO DATA LOAD DOWN LOAD IN MEMORY CARD (PCMCIA) BY COMPUTER THROUGH OMNY DRIVE

    Liaquat ALi 09 Jun 2008, 09:26 - Verstoß melden
Diese Foren sind nicht mehr aktiv. Um eine neue Diskussion zu veröffentlichen, besuchen Sie bitte unser Dubai Forum.

looking for a job

Diese Foren sind nicht mehr aktiv. Um eine neue Diskussion zu veröffentlichen, besuchen Sie bitte unser Dubai Forum.